Resumen
The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.
Idioma original | Inglés estadounidense |
---|---|
Título de la publicación alojada | Proceedings - 2022 8th International Conference on Information Management, ICIM 2022 |
Editorial | Institute of Electrical and Electronics Engineers Inc. |
Páginas | 182-185 |
- | 4 |
ISBN (versión digital) | 9781665451741 |
DOI | |
Estado | Indizado - 2022 |
Publicado de forma externa | Sí |
Evento | 8th International Conference on Information Management, ICIM 2022 - Cambridge, Reino Unido Duración: 25 mar. 2022 → 27 mar. 2022 |
Serie de la publicación
Nombre | Proceedings - 2022 8th International Conference on Information Management, ICIM 2022 |
---|
Conferencia
Conferencia | 8th International Conference on Information Management, ICIM 2022 |
---|---|
País/Territorio | Reino Unido |
Ciudad | Cambridge |
Período | 25/03/22 → 27/03/22 |
Nota bibliográfica
Publisher Copyright:© 2022 IEEE.