Resumen
The research proposal analyzed different structural, road and sanitary construction projects, using existing files, with which the time prediction method with equations of motion was evaluated to analyze its application to construction projects in Peru. Projects with delays were chosen and their prediction efficiency was evaluated. The evaluation was carried out through a velocity and acceleration analysis, considering the project life cycle in four stages. The velocity, acceleration, average velocity and position of each stage were calculated using mathematical equations. The final result was an efficiency index of the prediction method. The proposed research offers a degree of efficiency, in the alternative of a prediction method for Peruvian construction projects, saving time and resources with an easy application, to infrastructure projects, roads and sanitation, in turn it can be applied in different places with similar characteristics.
Idioma original | Inglés estadounidense |
---|---|
Título de la publicación alojada | MSIE 2023 - 2023 5th International Conference on Management Science and Industrial Engineering |
Editorial | Association for Computing Machinery |
Páginas | 222-226 |
- | 5 |
ISBN (versión digital) | 9798400708381 |
DOI | |
Estado | Indizado - 27 abr. 2023 |
Evento | 5th International Conference on Management Science and Industrial Engineering, MSIE 2023 - Chiang Mai, Tailandia Duración: 27 abr. 2023 → 29 abr. 2023 |
Serie de la publicación
Nombre | ACM International Conference Proceeding Series |
---|
Conferencia
Conferencia | 5th International Conference on Management Science and Industrial Engineering, MSIE 2023 |
---|---|
País/Territorio | Tailandia |
Ciudad | Chiang Mai |
Período | 27/04/23 → 29/04/23 |
Nota bibliográfica
Publisher Copyright:© 2023 ACM.