Abstract
The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.
| Original language | American English |
|---|---|
| Title of host publication | Proceedings - 2022 8th International Conference on Information Management, ICIM 2022 |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| Pages | 182-185 |
| Number of pages | 4 |
| ISBN (Electronic) | 9781665451741 |
| DOIs | |
| State | Indexed - 2022 |
| Externally published | Yes |
| Event | 8th International Conference on Information Management, ICIM 2022 - Cambridge, United Kingdom Duration: 25 Mar 2022 → 27 Mar 2022 |
Publication series
| Name | Proceedings - 2022 8th International Conference on Information Management, ICIM 2022 |
|---|
Conference
| Conference | 8th International Conference on Information Management, ICIM 2022 |
|---|---|
| Country/Territory | United Kingdom |
| City | Cambridge |
| Period | 25/03/22 → 27/03/22 |
Bibliographical note
Publisher Copyright:© 2022 IEEE.
Keywords
- SMED
- Set-up
- VSM
- lean manufacturing
- metalworking
Fingerprint
Dive into the research topics of 'Production Management Model to Reduce Cycle Times Using Lean Manufacturing in a Company in the Metalworking Sector'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver