Abstract
Worldwide, in works where earthmoving deliverables are predominant, heavy machinery represents between 20-50% of the total operating cost, so optimizing the processes that involve its use in this type of construction work becomes necessary. Unfortunately, there are few analytical methodologies for the sizing of the equipment to perform these works. For this reason, this article aims to develop a mathematical model capable of optimizing the costs incurred when determining the type and quantity of compactors, relying on linear programming. The whole process is developed through the application of the case study in a Highway project in Perú.
Original language | American English |
---|---|
Title of host publication | 2022 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2022 - Conference Proceedings |
Editors | Victor Manuel Fontalvo Morales |
Publisher | Institute of Electrical and Electronics Engineers Inc. |
ISBN (Electronic) | 9781665465250 |
DOIs | |
State | Indexed - 2022 |
Event | 2022 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2022 - Bogota, Colombia Duration: 5 Oct 2022 → 7 Oct 2022 |
Publication series
Name | 2022 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2022 - Conference Proceedings |
---|
Conference
Conference | 2022 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2022 |
---|---|
Country/Territory | Colombia |
City | Bogota |
Period | 5/10/22 → 7/10/22 |
Bibliographical note
Publisher Copyright:© 2022 IEEE.
Keywords
- earthwork
- Linear Programming
- Programming
- sizing of machinery